Waterproofing Accelerator
Applicable Scenarios
Applicable Substrates
Substrates with high water absorption rate, including all types of brick walls and slightly pulverized substrates.
Applicable Working Conditions
Waterproofing projects for building roofs, kitchens and bathrooms, balconies, basements and other areas, which can achieve waterproof and anti-seepage effects, and construction can be carried out on both the water-facing side and the back-water side.
Waterproofing Accelerator Construction Procedure
Substrate Requirements
Clean the surface of the substrate thoroughly before construction, no floating dust, oil stains or other pollutants are allowed.
Mixing Method
Mix polymer waterproof mortar component B and water in a ratio of 1:0.5~1, stir evenly before use.
Construction Method
It can be applied with a brush or roller, or sprayed with a coating spraying machine.
Coating Rate
The spraying dosage is 0.05~0.08kg/㎡, each 1kg bottle can cover approximately 12-20㎡.
Open Time
The material should be used immediately after mixing. The remaining slurry after mixing should be sealed and stored in a cool place. The total open time shall not exceed 48 hours to avoid performance loss affecting the use quality.
Post-Construction State
After the construction is completed, the coating is transparent.
Precautions
The material is surface dry 2-4 hours after construction. Subsequent construction procedures should be carried out as soon as possible after surface drying to prevent dust from adhering to the material surface and affecting construction quality.
Project guidance
Find the right material for your wall.
Share your project conditions with us for product and application guidance.