1. Substrate Requirements: The substrate surface must be thoroughly cleaned before application, free of floating dust, oil stains, and other contaminants.
2. Mixing Instructions: Mix High-Penetration Mortar Component B and water at a ratio of 1:0.2~0.5, stir thoroughly until uniform, then the mixture is ready for use.
3. Application Method: Apply with a bristle brush or roller, or use a coating sprayer for spray application.
4. Coverage Rate: 0.1~0.12kg/m² for spray application, approximately 0.15~0.2kg/m² for roller application; each 1kg bottle covers approximately 5-10m.
5. The mixed material should be used immediately after preparation. After mixing, the slurry must be stored sealed in a cool place, with a pot life of no more than 48 hours to avoid performance degradation that would compromise application quality.
6. Color after application: Transparent
7. Precautions:
(1)Once the material is surface-dry 1 hour after application, proceed with subsequent construction steps as soon as possible to prevent dust from adhering to the material surface and compromising application quality.
(2)Use with caution in scenarios involving high-strength concrete surfaces and heavy dust accumulation.